Sample Report

Sample verification report

This is what you’re actually paying for.

A redacted specimen of the report a client receives before deciding on a property. Names, plot numbers and identifying details removed. The structure and the level of detail are real.

Specimen · Not a live property

BuildSoWell

Property Verification Report

Reference BSW-

SECTION 01

Property summary

Property type
Off-plan apartment, 2 bedroom
Area
Bijilo, Kombo North
Plot reference
Developer
Advertised price
Client instructed
Day 0: brief received, scope agreed
Report issued
Day 9: nine working days from instruction
Site attended
Day 6: in person, photographed and dated

SECTION 02

Checks completed

Title search at the Lands Registry Registered title located and inspected. Registration confirmed in the developer’s name.
Clear
Ownership chain traced Traced back through three prior transfers. No break or irregularity identified.
Clear
Encumbrance search No registered charges, claims or disputes found against the plot.
Clear
Planning approval & permits Approval granted for the development. Amended drawings for the upper floors were still pending at the date of inspection.
Note
Developer company search Registered and active. Directors verified. Two prior developments completed and inspected by us.
Clear
Construction stage vs advertised Advertised as 70% complete. Observed at approximately 55%: structure up, first fix not started on the upper floors.
Discrepancy
Boundaries against site plan Plot dimensions measured on site and matched to the registered plan. No encroachment observed.
Clear
Access, water and power Tarred road access to the site. Mains water and NAWEC connection present at the boundary.
Clear

SECTION 03

Site photographs

Attended in person on day 6. All images dated and geotagged at the point of capture. Twenty-eight photographs supplied in the full report; three shown here.

Front elevation
Plot boundary
Approach & access

SECTION 04

Findings

Positive

The title is registered, unencumbered and held in the developer’s own name. This is the single most important finding and it is clean. Two of the developer’s previous projects were inspected by us and both were completed to the standard advertised.

Requires attention

Construction is materially behind what was advertised. The seller described the unit as 70% complete; our inspection on day 6 put it closer to 55%. This is not evidence of bad faith, because rainy season delays are common, but it does mean the completion date you have been given is unlikely to hold.

Requires attention

Amended planning drawings for the upper floors had not been approved at the date of inspection. The developer states approval is expected. We would want that confirmed in writing before any payment attributable to those floors is released.

Raised with the seller

The draft sale agreement provided contains no provision for what happens if the build is not completed. We have asked for a completion longstop date and a remedy clause to be added. We would not advise signing the agreement in its current form.

SECTION 05

Recommendation

Option AProceed
Option BProceed with conditions
Option CDo not proceed

Our recommendation is to proceed, subject to three conditions being met in writing before further payment.

One: a revised completion date agreed in writing, reflecting the actual construction stage rather than the advertised one.

Two: a longstop date and remedy clause added to the sale agreement, so there is a defined outcome if the build overruns.

Three: confirmation of approved amended drawings for the upper floors before any payment attributable to those floors is released.

The fundamentals here are sound. The title is clean, the developer has a real track record, and the site is what it was described to be. The issues are contractual, and all three are fixable before you commit further money.

Prepared by BuildSoWell · United Kingdom & The Gambia Specimen document · 28 pages in the full report

The full report

What arrives in your inbox on day nine.

The specimen above shows the shape of it. Here’s everything the complete document contains.

01

Property summary

Type, area, plot reference, developer, advertised price, and the dates every stage of the work was carried out.

02

Registry findings

Title search result, the ownership chain traced back, and the encumbrance search, with copies of what we obtained.

03

Developer background

Company search, directors, trading history, and our own inspection of previous completed projects.

04

Site photographs

Typically twenty to thirty images, dated and geotagged. Structure, finish, boundaries, access, and the surrounding street.

05

Findings

Everything we found, sorted into positive, requires attention, and raised with the seller. Written plainly, no hedging.

06

Recommendation

Proceed, proceed with conditions, or do not proceed, with the reasons stated so you can show anyone who disagrees.

About this specimen

This is an illustrative document. The structure, the categories of check and the level of detail reflect a real report, but the property does not exist and no identifying information belongs to any actual client or developer.

Every property is different. The checks that matter on a registered apartment are not the checks that matter on unregistered land, and the report reflects that.

A verification report is not legal advice, a survey, or a substitute for your own solicitor. It is an independent record of what we found, so that you and anyone advising you are working from facts rather than from what you were told.

Start here

Send us the property. We’ll tell you what we think.

A listing link, a WhatsApp forward, a photo of a signboard, whatever you have. We’ll tell you honestly whether it’s worth checking properly, before you spend anything with us.

No cost for the first look. No pressure to go further.